42nd Annual Conference

600,000 M.T. to Move, a High Risk Operation (Room Concorde B)

01 Feb 16
11:00 AM - 11:30 AM

Tracks: Vibration and Fragmentation

In 2014, Holcim Canada considered the possibility to drill and blast 600,000 M.T. to expose a limestone bench in one of its urban quarry in Laval, Canada. The project includes many challenges and was qualified as high risk operation. PROTEKROC, a drilling and blasting consultant, was commissioned to design the blasts.