42nd Annual Conference
Tweet
Sessions
Speakers
Exhibitors
Floor Plan
Buzz
Tunnel Lining Removal and Excavation by Controlled Blasting
(
Room
Concorde B
)
02 Feb 16
8:30 AM
-
9:00 AM
Tracks:
Field Blasting 1: Case Studies
Speaker(s):
Jeff Hammer, Buckley Powder
Innovative blasting techniques as well as engineering the existing lining to demolished during blasting were used to meet the demanding schedule and remove the lining with minimal use of mechanized concrete removal.
Home
Sessions
Speakers
Exhibitors
Floor Plan
Tweet
Login
|
Back to top
ChirpE