DOT International 2015
Tweet
Sessions
Speakers
Exhibitors
Products
Floor Plan
Search
Sessions
(69)
View/Sort by
Tracks
|
Day
Details
Advisory Board Chairman Welcome
13 Oct 15
8:30 AM
-
10:30 AM
International Operator Perspectives 2
13 Oct 15
8:30 AM
-
10:30 AM
Keynote Address: Dr. Pedro Silva-López, Chief Technology Officer, PEMEX
13 Oct 15
8:30 AM
-
10:30 AM
OPENING PLENARY
13 Oct 15
8:30 AM
-
10:30 AM
Welcome & Introduction
13 Oct 15
8:30 AM
-
10:30 AM
Coffee Break
(
Room
Upper Level (outside waterway 4)
)
13 Oct 15
10:30 AM
-
11:00 AM
Enabling Subsea Produced Water Reinjection through In-line Water Treating and Monitoring Technologies for Deeper Water Applications
13 Oct 15
11:00 AM
-
11:30 AM
SESSION 1: Floating Production Facilities & Mooring
13 Oct 15
11:00 AM
-
12:30 PM
SESSION 1: Subsea Technology Advancements
13 Oct 15
11:00 AM
-
12:30 PM
Two World Firsts - Subsea Compression at Gullfaks and Ã…sgard
13 Oct 15
11:00 AM
-
12:30 PM
VIM-Induced Mooring Fatigue Prediction for Floating Production Facilities: Line Dynamics and Comparison with Field Measurements
13 Oct 15
11:00 AM
-
11:30 AM
Finite Element Analysis (FEA) of Large Deepwater Mooring Chains Subjected to Out-of-Plane Bending (OPB)
13 Oct 15
11:30 AM
-
12:00 PM
Subsea Water Treatment and Injection – Application Range and Approach for Design Selection
13 Oct 15
11:30 AM
-
12:00 PM
Tether Connector and Subsea Tensioning System for Buoyancy Supported Risers
13 Oct 15
12:00 PM
-
12:30 PM
Delegate Lunch
(
Room
Delegate Restaurant
)
13 Oct 15
12:30 PM
-
2:00 PM
The Deepwater Market: Challenges and Opportunities
13 Oct 15
2:00 PM
-
3:00 PM
Welcome Reception
(
Room
Exhibit Hall
)
13 Oct 15
3:00 PM
-
5:00 PM
Application of Casing Wear Theory to Top Tensioned Risers
14 Oct 15
9:00 AM
-
10:30 AM
Deepwater Mooring Anchor Design and Procurement Experience for Jack/St. Malo Semi-submersible Floating Production Facility
14 Oct 15
9:00 AM
-
9:30 AM
SESSION 2: Deepwater Projects - Lessons Learned
14 Oct 15
9:00 AM
-
10:30 AM
SESSION 2: Riser Design & Deployment
14 Oct 15
9:00 AM
-
10:30 AM
Composite Material Choke and Kill Lines – Experiences from Qualification and Operation
14 Oct 15
9:30 AM
-
10:00 AM
Design and Optimization of New Drilling Riser Joints for Drilling Operation in High Current and Deepwater
14 Oct 15
10:00 AM
-
10:30 AM
Upper Deck Renewal and Topsides Integration, the Example of Cidade de Maricá and Cidade de Saquarema FPSO Conversion
14 Oct 15
10:00 AM
-
10:30 AM
Coffee Break
(
Room
Exhibit Hall
)
14 Oct 15
10:30 AM
-
11:00 AM
Deepwater Asset Integrity Management – Riser Tower Monitoring in Angola
14 Oct 15
11:00 AM
-
11:30 AM
Estimating Peak Long Term Extremes from Finite Duration Simulations
14 Oct 15
11:00 AM
-
12:30 PM
Fusion Bonded Joint: An Innovative Technology for Cost Efficient Plastic-lined Pipe Installation and Operation – Completion of Qualification Campaign
14 Oct 15
11:00 AM
-
11:30 AM
SESSION 3: Asset Integrity
14 Oct 15
11:00 AM
-
12:30 PM
SESSION 3: Pipeline Construction & Installation
14 Oct 15
11:00 AM
-
12:30 PM
Improved Approach to Assessing the Weld Integrity of High Risk Deepwater Pipelines
14 Oct 15
11:30 AM
-
12:00 PM
Towards API RP 2MIM - DeepStar® Guidelines for Risk Based Mooring Integrity Management
14 Oct 15
11:30 AM
-
12:00 PM
Advantages of Generating Pipeline Local Residual Curvature During Reel – and S–lay Installation
14 Oct 15
12:00 PM
-
12:30 PM
Improving Offshore Inspection Efficiency Through UAV (Unmanned Aerial Vehicle) Inspections'
14 Oct 15
12:00 PM
-
12:30 PM
Delegate Lunch
(
Room
Delegate Restaurant
)
14 Oct 15
12:30 PM
-
2:00 PM
A Proactive Approach to the Life Extension of Deep Water Production Facilities
14 Oct 15
2:00 PM
-
3:30 PM
Alternate: Ni-Fe Nanomaterial: Ameliorating Flow Assurance
14 Oct 15
2:00 PM
-
3:30 PM
Evolving Needs of Subsea Flow Assurance: an Industry Response
14 Oct 15
2:00 PM
-
2:30 PM
SESSION 4: Emerging Technology & Development Trends
14 Oct 15
2:00 PM
-
3:30 PM
SESSION 4: Flow Assurance & Production Optimization
14 Oct 15
2:00 PM
-
3:30 PM
The Low Motion FPSO (LM-FPSO); a Novel SCR and TTR Friendly Floater
14 Oct 15
2:00 PM
-
2:30 PM
Increasing Oil Well Production by the Application of Black Oil Foamers
14 Oct 15
2:30 PM
-
3:00 PM
Safety Performance Analysis of Deepwater Drilling Riser for Hang-off Modes in Typhoon Condition of South China Sea
14 Oct 15
2:30 PM
-
3:00 PM
Challenging the Water Depth Limitation on a Conventional TLP Tendon Design
14 Oct 15
3:00 PM
-
3:30 PM
Discovery - Subsea CT (Computed Tomography) Technology for Pipeline Integrity and Flow Assurance Visualization.
14 Oct 15
3:00 PM
-
3:30 PM
Coffee Break
(
Room
Exhibit Hall
)
14 Oct 15
3:30 PM
-
4:00 PM
Alternate: Pull Tube Stress Joint: Design for Repair on Existing Pull Tube Stress Joine and Alternative Design for New Construction
14 Oct 15
4:00 PM
-
5:30 PM
Creating a Network to Achieve Real Time Monitoring of Sea-surface Currents for Oil & Gas Operations Offshore Angola
14 Oct 15
4:00 PM
-
4:30 PM
Dual Casing Drilling Riser Thermal Analysis and Development of Tensioner Schedule for Operations
14 Oct 15
4:00 PM
-
4:30 PM
Regulatory and Risk Management Developments Impacting Deepwater Exploration, Production and Well Intervention - are you Prepared for the New Normal?
14 Oct 15
4:00 PM
-
5:30 PM
SESSION 5: Offshore Safety & Environment
14 Oct 15
4:00 PM
-
5:30 PM
SESSION 5: Riser Management & Subsea Processing
14 Oct 15
4:00 PM
-
5:30 PM
EnEnhanced Methodologies for Predicting Extreme Values in Deepwater Riser Design
14 Oct 15
4:30 PM
-
5:00 PM
Enhancing Attractiveness of Deepwater Gas-Liquid Gravity Separation
14 Oct 15
5:00 PM
-
5:30 PM
Networking Reception
(
Room
Exhibit Hall
)
14 Oct 15
5:00 PM
-
6:00 PM
International Operator Perspectives 1
15 Oct 15
8:30 AM
-
10:30 AM
Practical Approaches to Enhance Deepwater Project Value
15 Oct 15
8:30 AM
-
10:30 AM
Coffee Break
(
Room
Exhibit Hall
)
15 Oct 15
10:30 AM
-
11:00 AM
Alternate: Fiber Rope for Deep Water Installations - 5 year operational case study.
15 Oct 15
11:00 AM
-
12:30 PM
Alternate: Update on Work Class Autonomous Surface Vehicles for Offshore Operations
15 Oct 15
11:00 AM
-
12:30 PM
Decommissioning and Release of Offshore Floating Facilities: Best Practice for Mooring-Riser System Disconnection, Hull Positioning, and Intercontinental Towing.
15 Oct 15
11:00 AM
-
11:30 AM
Dynamic Modeling and Analysis for ROV Impact on Subsea Equipment
15 Oct 15
11:00 AM
-
11:30 PM
SESSION 6: Deepwater Construction & AUV/ROV Operations
15 Oct 15
11:00 AM
-
12:30 PM
SESSION 6: Deepwater Project Economics
15 Oct 15
11:00 AM
-
12:30 PM
Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Development
15 Oct 15
11:30 AM
-
12:00 PM
The Rise of Remotely Managed AUVs as Very Cost Effective Solutions in a Challenging Market
15 Oct 15
11:30 AM
-
12:00 PM
Floating Production Systems- Applying Learnings from Project Execution
15 Oct 15
12:00 PM
-
12:30 PM
Investigating, Defining and Expanding the Limits of Reel-Lay
15 Oct 15
12:00 PM
-
12:30 PM
Delegate Lunch & Closing Ceremony
(
Room
Delegate Restaurant
)
15 Oct 15
12:30 PM
-
2:00 PM
Home
Sessions
Speakers
Exhibitors
Products
Floor Plan
Tweet
Login
|
Back to top
ChirpE