2021 Nashville AISTech
Tweet
Sessions
Speakers
Exhibitors
Products
Press Releases
Show Specials
Floor Plan
Buzz
Accelerated Upgrade Plan for Static VAR Compensators
(
Room
202 B
)
29 Jun 21
2:00 PM
-
2:30 PM
Tracks:
Electrical Applications: I
Speaker(s):
Anil Kanagala, Engineering Manager, Primetals;
Visvesvaran Subramanian, Primetals Technologies USA LLC
Static VAR compensators play a vital role in providing power quality compliance and network stability to electric arc furnaces. Considering a typical life cycle of 20 years, upgrading aging SVC equipment ensures maximum meltshop production. Recent increase in production demand from meltshops has challenged maintenance supervisors with fewer and shorter downtimes available for equipment upgrades and servicing. This paper presents an executed plan where a conventional SVC installation and commissioning schedule was compressed from two months to just 11 days. This paper details the execution plan, risk analysis, challenges encountered and remedial measures taken to ensure on-time start-up.
Home
Sessions
Speakers
Exhibitors
Products
Press Releases
Show Specials
Floor Plan
Tweet
Login
|
Back to top
ChirpE