HydroVision International 2015
Tweet
Sessions
Speakers
Exhibitors
Products
Press Releases
Show Specials
Floor Plan
Speakers
Myriam
Lindeperg
Myriam Lindeperg
Assistant to Product Management
Alstom
Product Management & Promotion Assistant
Sessions :
Tidal Barrage Hydro Power Plants
Emergency Safety Downstream Gates for Reversible Power Plants
Outage Time Reduction by Rethinking the Way of Improving Stay Vane Profiles: An Industrial Application
Machine Signature Analysis: A Review of Existing and Potential Techniques and Their Applications to Hydraulic Turbines and Generator Units
Optimizing Dissolved Oxygen Transfer in Auto-Venting Turbines
Validation Measurements of the World’s Largest Air-Cooled Hydro Generator
Real World Test of Closing Ring Gate in Emergency Conditions (Full Discharge)
Variable Speed Pumped Storage Plants – Project Execution and Development Toward New Operation Schemes
Wanapum Dam Research Campaign: A Success Story Between Manufacturing, Research and Plant Operations
Turbine Rehabilitation: Chief Joseph SMS Case Study
Refurbishment of a Centenary Small Hydro-Turbines Power Plant: Issues & Challenges
Emergency Repairs on Generator Stator Windings
Increasing Sir Adam Beck Hydro Power Plant Productivity by Upgrading Pumped Storage Flexibility and Capacity
Providing Grid Flexibility -- Technology Trends and Regulatory RestrictionsA Pumped Hydro Energy Storage Case Study
Generator Condition Assessment, an Efficient Tool to Prevent Unscheduled Outages and Minimize Their Duration
Home
Sessions
Speakers
Exhibitors
Products
Press Releases
Show Specials
Floor Plan
Tweet
Login
|
Back to top
ChirpE