Geosynthetics Conference 2019

Technical Session: Walls and Slopes (2) (Room Houston I)

12 Feb 19
1:30 PM - 3:00 PM

Tracks: Case Study Sessions, Classroom Education, Technical Sessions

Session Chairs: Michael Simac, EARTH Improvement Technologies; Ryan Berg, Ryan R Berg & Associates, Inc.

Yeager Airport: Deconstruction and Reconstruction of the Side of a Mountain

Allen Cadden, Schnabel Engineering; Gary Brill and Michael Senior, Schnabel Engineering

Design and Repair of a Reinforced Steep Slope, Pinnacle Shopping Center at Tutwiler, Birmingham, Ala.

Robert L. Goehring, ECS Southeast LLP

Geosynthetic Strip MSE Wall Case Study at Point Defiance Marina

Paul C. Frankenberger and Robert Lozano, The Reinforced Earth Company

Repair of a Segmental Retaining Wall with Multiple Failure Modes

Donal J. Armstrong, Oldcastle Architectural

Stabilization of Tiered Geosynthetic MSE Wall at Carver High School

Chadwycke L. Clark and Lance Carter, Earth Retention Systems